RONALD J. BUCKLEY 3226 Montauk Hill
Dr.
Home
Phone: (678) 546-0630 Buford, GA
30519
Cell Phone: (678)764-2089 e-mail: rjbuckley05@gmail.com
LinkedIn URL: www.linkedin.com/pub/ron-buckley/21/1b5/a91 EMPLOYMENT OBJECTIVE To acquire a position as a Project
Scheduler/Planner which allows me to apply my current experience and to gain
additional experience while contributing to the project. WORK EXPERIENCE Evans Technology, Atlanta, GA Construction Inspection Scheduler, June 2015 to
present Employed as a contractor at the Nuclear
Regulatory Commission Region II Office in Atlanta. Maintain the
resource-loaded inspection schedule using Primavera Project Manager
Scheduling Software (P6) for the Vogtle Units 3 & 4 Nuclear Power Plants
currently undergoing construction in Waynesboro, GA. Construction
schedule data from the field site is imported into the inspection schedule to
determine when various structures are ready to be inspected by resident or
regional inspectors. Rohadfox Construction Control Services Co.
(October 2007 to June 2015) B&E Jackson Engineers (November 1999 to
September 2007)
Senior Scheduler, November 1999 to
June 2015 Employed at Metropolitan Atlanta Rapid
Transit Authority (MARTA), Atlanta, GA by MARTA’s General Engineering
Consultant to oversee the project schedules for several design and
construction contracts using Primavera Project Manager (P6) and
Primavera Project Planner (P3) Scheduling Software. The
value of the projects ranges between $2 million and $281 million.
Projects have included rail car procurement, new rail station construction,
systemwide communications upgrade, systemwide fare collection system upgrade,
closed circuit television (CCTV) upgrade, track renovation, trackway signaling
upgrade, and new rail yard and auxiliary facility construction.
Responsibilities include: · Reviewing various contractors’ weekly and monthly progress
schedules for compliance to contractual requirements and milestones. · Participating in Weekly Progress Meetings including
discussion of a project’s critical path and identification of any needed
corrections to the schedule. · Developing planning and design schedules for upcoming
projects to determine reasonable design and construction durations to use in
the contract specifications. · Weekly and monthly status reporting of all projects. · Verification of schedule impacts due to additional change
order work. Ensco, Inc., Owego, NY Senior Planning Analyst, January 1998 to
November 1999 Employed as a contractor at Lockheed
Martin Federal Systems in Owego, NY. Maintained the resource-loaded
CPM schedule for the Navy SH-60 Seahawk Light Airborne Multi-Purpose System
(LAMPS) Helicopter Avionics Program using Primavera Project Planner
(P3) Scheduling Software. Major responsibilities included: · Entered monthly status updates into the schedule including
earned value inputs. · Analyzed the schedule’s critical path and reported the
impacts to responsible task owners and management. Impact mitigations
are subsequently entered into the schedule. · Added new tasks to the schedule as needed as well as any
related resources or relationship linkages. · Rebaselined the schedule, when authorized by the customer,
which involved either modifying existing tasks and resources or adding new
tasks and resources. GEC AlsthomTransportation., Hornell, NY Planning Analyst, August 1993 to
January 1998 Employed by a manufacturer of Rail Transit
Cars and Propulsion Systems; worked on projects with a value up to $100
million, with the following responsibilities: · Developed and maintained CPM schedules covering both
design and production phases for multiple projects using Primavera Project
Planner (P3) scheduling software. · Tracked and responded to correspondence letters from the
customer. Submitted deliverables including test reports, and technical
manuals. · Tracked status of field modifications performed by four
different field service sites using a spreadsheet matrix. · Reviewed Maintenance and Parts Manuals for accuracy and
edited accordingly. Morrison Knudsen Corp., Hornell, NY Test Engineer, August 1992 to
August 1993 Employed as a Test Engineer with the
following responsibilities: · Developed, installed, and implemented a UNIX-based Data
Acquisition System (DAS) used in a Climate Room to test the performance of
HVAC systems installed on railcars. · Developed apparatus and supporting documentation necessary
to calibrate the DAS to MIL-STD 45662A as well. · Involved in the development and implementation of an
onboard Data Acquisition System used to test the railcar wiring. · Wrote several test procedures for M-6 Transit Cars. Zurn/NEPCO Corp., Batavia, NY Project Controls Engineer, June 1989 to June
1992 Assigned to four (4) different combined
cycle power cogeneration construction projects in Upstate New York, with
approximate value of $60 million each, with responsibilities which included
the following: · Maintained project schedules and progress reports using
both a personal computer and an IBM AS/400 mainframe computer. · Cost coded all material purchase requisitions and verified
cost coding of all daily timesheets. · Administered the quantity reporting system and performed
periodic audits to assure compliance. · Processed and tracked all backcharge and rework
information. · Forecasted deviations from the current budget using
various estimating tools and techniques and revised the budget accordingly. SCI Technology, Inc., Owego, NY Test Lab Quality Engineer, August 1987 to
May 1989 Performed duties for a military electronics
subcontractor with the following responsibilities: · Verified the calibration integrity of all test equipment. · Certified test product and all associated testing
software. · Interfaced with the customer regarding quality
issues/concerns. · Monitored and addressed any on-going subassembly failure
trends. · Performed periodic operational audits. · Created and modified quality procedures and instructions
for implementation. SPECIAL SKILLS Certified
in the use of Primavera Project Manager (P6) and Project Planner (P3)
scheduling software, proficient in the use of MS Excel, MS Word and MS
Outlook; familiar with MS Project; adept in reading assembly drawings
and schematics. EDUCATION Bachelor Degree in Electrical
Engineering Technology State University of New York at
Binghamton, Binghamton, NY Associate Degree in Electrical
Engineering Technology Broome Community College,
Binghamton, NY INTERESTS/HOBBIES Currently
working towards obtaining AACE’s Planning and Scheduling Professional (PSP)
certification. Former
President of Home Owners’ Association, former Boy Scout committee leader,
former Cub Scout Den Leader. Hobbies include: History,
Science, Sightseeing, Bicycling, Running. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Beginner |
|
|
|